The 2025 drilling program on Galinée consisted of fourteen (14) diamond drill holes and nine (9) reverse circulation (“RC”) drill holes totalling 4,105.09 metres, out of which 1,078.60 metres were RC ...
Objectives This study aimed to identify the predictors of burnout, anxiety and depression among healthcare professionals during the COVID-19 pandemic. Design A secondary quantitative analysis of data ...
The Conference Board's Consumer Confidence Index fell for a fifth straight month in December, dropping 3.8 points to 89.1.
Abstract: In complex process industries, multivariate time sequences are omnipresent, whose nonlinearities and dynamics present two major challenges for soft sensing of important quality variables.
The complete set of results for A25-025 are summarized in Table 1 below. Mr. Gendall, President and CEO, commented: "Drillhole A25-025 was successful in extending and infilling copper, molybdenum and ...
Proper signal filtering at the source minimizes aliasing errors and improves the accuracy of digital data used for control and analytics. Teaching filtering concepts through visual simulations and ...
Will Kenton is an expert on the economy and investing laws and regulations. He previously held senior editorial roles at Investopedia and Kapitall Wire and holds a MA in Economics from The New School ...
All channel samples are collected directly from the bedrock. A geologist examines the bedrock and marks out the intervals to be sampled and the cutting line. Sample lengths are mostly 1.0 m and ...
Mud logging is the real-time surface monitoring and interpretation of cuttings, drilling parameters, and mud gas to support safe, efficient drilling and formation evaluation during well construction.
· Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma ...
The configured sample interval assumes a battery telemetry update rate of ~50 Hz from CAN-based power modules. However, not all CAN-based power modules send telemetry at such high rates — in fact, 50 ...
Wes Hanson, President and CEO stated, "The Phase Two drill program was completed on time and on budget with 1,773 metres of a planned 1,800 metres completed. Sample cutting is in progress and results ...